Basement week one

P1010009.JPG
Basement door to the garage door
P1010010.JPG
The old bar in the basement
P1010011.JPG
Basement bathroom
P1010012.JPG
The whole wall is made of nasty old closet doors
P1010013.JPG
Basement workshop. Note the horrible shelves and nasty old windows
P1010014.JPG
Bad, bad shelving
P1010015.JPG
View from the workshop into the laundry
P1010016.JPG
The laundry room
P1010017.JPG
Old fusebox
P1010018.JPG
Old plumbing
P1010019.JPG
Piping for the heating system
P1010020.JPG
I think that this is a fusebox or maybe something to do with the phone system
P1010021.JPG
More shelving. It was everywhere down there
P1010022.JPG
The back of the bar.
P1010023.JPG
The wood walls removed
P1010024.JPG
Walls removed, pipes exposed
P1010025.JPG
Bar is gone!
P1010027.JPG
More pipes and the back of appliances
P1010031.JPG
New cleaned up plumbing in the floor, and holes filled in with new cement
P1010032.JPG
Ceiling removed, and vapor barrier on the walls
P1010033.JPG
Vapor barrier on walls, and new glass block windows
P1010034.JPG
Plumbing exposed, ready to be replaced with shiny new copper pipes
P1010035.JPG
Old piping - ready to go next week
P1010036.JPG
Crazy old plumbing
P1010037.JPG
More pipework to be cleaned up
P1010038.JPG
The bathroom with the floor newly cemented
P1010040.JPG
The garage full of lumber and wall insulation, ready for new walls to be installed next week